Loading...
HomeMy WebLinkAboutRES 98-269 RESOLUTION NO. WHEREAS, on Monday, August 24, 1998, bids were received for furnishing all supervision, labor, materials, equipment and bonding for the construction of three neighborhood fire stations to be located at 805 Woodrow Street, 1880 Major Drive, and 6375 Walden Road; and, WHEREAS, Daniels Building & Construction submitted a bid in the amount of Two- Million, One-Hundred Ninety-Nine Thousand and Two-Hundred ($2,199,200.00) Dollars; and WHEREAS, City Council is of the opinion that the bid submitted by Daniels Building & Construction should be accepted; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the bid submitted by Daniels Building & Construction in the amount of Two-Million, One-Hundred Ninety-Nine Thousand and Two-Hundred ($2,199,200.00) Dollars for furnishing all supervision, labor, materials, supplies, equipment and bonding for the construction of three neighborhood fire stations to be located at 805 Woodrow Street, 1880 Major Drive, and 6375 Walden Road should be accepted by the City of Beaumont. BE IT FURTHER RESOLVED that the City Manager is authorized to execute a contract with Daniels Building & Construction in the amount of$2,199,200.00 for the project; and, BE IT FURTHER RESOLVED that the City Manager is authorized to execute Change Order No. 1 in the amount of$254,104.00to incorporatethe changes in scope of work into the construction contract and to reduce the contract amount to $1,945,096.00. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 9 day of 11998. ) 't - Mayor - Relocation of Fire Stations September 22, 1998 Page 3 City of Beaumont Recommended Value Engineering Alternatives Fire Stations#3,#6, and #11 Site Items: Deduct 1. Delete selected 4 inch(4")concrete walks. $6,006 2. Delete all landscaping and sodding except for three feet(3')sod strip at paving/walks and hydro-seed the balance of area originally sodded. $36,300 3. Delete all lime stabilization of subgrade. $14,100 4. Lower elevation of Major Dr. Station#6 only by one foot(1'). $5,078 Building Items: 1. Replace standing seam metal roof system with 30 years architectural grade shingles over 15#felt. Metal gutters, trim& soffit to remain in manufacturers' standard colors. $27,399 2. Use four inch(4")concrete masonry unit(CMU) in lieu of eight inch(8") and use plain stained CMU in lieu of colored split face. $30,500 3. Use overhead doors as specified at rear of stations on front and rear in lieu of glass paneled doors at front. $3,675 4. Use six-inch (6") painted pipe bollards in lieu of McKinley wheel guards at front of stations. $1,510 5. Delete all cast plaques and interior graphics except for restroom signage. $1,037 all station flag poles. S3,6 - 7 Delete all projection screens in the stations. $3,615 8. Delete all marker boards in the stations. $1,413 9. Use residential type range in lieu of a commercial unit specified. $2,207 10. Delete portions of Sico closet furniture as specified. $6,501 12. Delete millwork desk and upper cabinet in Captain rooms. $1,650 13. Use clear anodized aluminum in lieu of powder coat paint on overhead doors. $8,030 14. Delete interior doors 108 and 115 and supporting walls. $2,388 15. Delete one Sico bed and additional cabinet from all stations. $3,797 16. Use bronze or clear anodized aluminum in lieu of specified color finish on aluminum windows. $2,591 Mechanical Items: 1. Use Carrier equipment for HVAC system in lieu of Trane. $1,819 2. Delete all sheetmetal duct work with line and use standard duct board. $2,650 EXHIBIT "A" Relocation of Fire Stations September 22, 1998 Page 4 Deduct Electrical Items: 1. Delete generators and all associated switch gear. $40,450 2. Non-addressable fire alarm in lieu of the addressable units specified. $4,056 3. Use an alternate light fixture package at all three stations. $7,500 Plumbing Items: 1. Delete additional gas piping for stove units. $510 2. Use alternative restroom fixtures, sinks and faucets. $2,029 3. Use residential type 52 gallon water heater in lieu of commercial unit specified. $870 4. Use standard 500 gallon sand separators in wash down areas. $1,750 5. Delete water pipe insulation and loop water piping under foundation. $3,008 6. Delete sprinkler system except for a fire hydrant with line. 531.665 Total Qom. izuz'J'AT -7-5-f"/,a f