HomeMy WebLinkAboutRES 97-295 RESOLUTION NO. c
BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF BEAUMONT:
THAT the City Manager be and he is hereby authorized to execute an amendment to the
Engineering Services Contract for the City of Beaumont, ICR Compliance with Black &
Veatch . The contract is substantially in the form attached hereto as Exhibit "A" .
PASSED BY THE CITY COUNCIL of the City of Beaumont this the, day
of 1W_ 1997.
C I Q
VV
- Mayor -
AMENDMENT TO
ENGINEERING SERVICES CONTRACT
CITY OF BEAUMONT
ICR COMPLIANCE
Amend the Engineering Services Contract for the City of Beaumont, ICR Compliance
which was originally executed on November 21, 1996 as follows:
1. Add the following to Attachment A, Scope of Services
"PHASE 8 - RAPID BENCH-SCALE MEMBRANE TESTING (RBSMT)
Task 1 - Develop Protocol
Black & Veatch LLP (B & V)will work with the City of Beaumont to evaluate
available data and determine the best protocol for the Rapid Bench-Scale
Membrane Testing (RBSMT); including determining the sample collection point,
sampling schedule, Simulated Distribution Study (SDS), storage conditions, and
selecting the two membrane types and pretreatment processes based on membrane
manufacturers' data and the water quality parameters. This task will include a
workshop meeting in Beaumont with City staff.
Task 2 - Coordinate with EPA
Based on the protocol developed in Phase 1, B & V will complete and submit the
forms required before testing begins, including the Study Concept Form and the
Study Plan. B & V will coordinate with the EPA to secure approval of the
Concept and Plan. B & V will also review EPA reporting forms completed by the
analytical laboratory to ensure the ICR requirements are met.
Task 3 - Acquire Membrane Materials
B & V will acquire the selected membrane and spacer materials after EPA has
approved the Study Plan.
Task 4 - Progress Meetings
B & V will meet in Beaumont with the City staff before the first sampling event,
at the approximate midpoint of the project, and at project completion to coordinate
logistics and present results.
Task 5 - Verify RBSMT Protocol
The actual operation of the RBSMT will be performed by a certified analytical
laboratory. B & V will verify that the test methods meet EPA's guidelines. This
task will include a B & V membrane specialist working with laboratory staff at
their site during a trial run of the RBSMT equipment.
October 7, 1997 AMEND-1
EXHIBIT "A"
Task 6 - RBSMT Testing and Analysis
The ICR requires that the treatment study be conducted in four consecutive
quarters for one year. The following procedures will be completed for each
quarterly study:
Subtask 1 - Sample Collection
• Two 55-gallon containers will be shipped to the City of Beaumont for water
sample collection.
• City of Beaumont staff will collect water samples in the two 55-gallon
containers at a point determined by the City and Black & Veatch.
• Black & Veatch will coordinate sample collection with refrigerated shipment of
the two 55-gallon containers to the laboratory to ensure sample integrity during
transport.
Subtask 2 - Treatment Study
• Upon arrival at the laboratory, the sample will be analyzed for TOC and any
other parameters necessary to assess sample representativeness.
• All samples will be stored at 4°C.
• Laboratory will conduct two rapid bench-scale membrane tests (one test with
each of the two membranes) based on the ICR Manual for Bench- and Pilot-
Scale Treatment Studies. Each RBSMT may run up to 10 days depending on
the water quality, membrane, and design. The tests will be as follows:
First Quarter
Membrane 1 Run 1 Run 2 Run 3 Run 4
Recovery = Recovery = Recovery = Recovery =
70 percent 90 percent 50 percent 30 percent
Membrane 2 Run 1 Run 2 Run 3 Run 4
Recovery = Recovery = Recovery = Recovery =
70 percent 90 percent 50 percent 30 percent
Second
Quarter
Membrane 1 Run 1 Run 2 Run 3 Run 4
Recovery = Recovery = Recovery = Recovery =
70 percent 90 percent 50 percent 30 percent
Membrane 2 Run 1 Run 2 Run 3 Run 4
Recovery = Recovery = Recovery = Recovery =
70 percent 90 percent 50 percent 30 percent
October 7, 1997 AMEND-2
Third Quarter
Membrane 1 Run 1 Run 2 Run 3 Run 4
Recovery = Recovery = Recovery = Recovery =
70 percent 90 percent 50 percent 30 percent
Membrane 2 Run 1 Run 2 Run 3 Run 4
Recovery = Recovery = Recovery = Recovery =
70 percent 90 percent 50 percent 30 percent
Fourth
Quarter
Membrane 1 Run 1 Run 2 Run 3 Run 4
Recovery = 70 Recovery = Recovery = Recovery =
percent 90 percent 50 percent 30 percent
Membrane 2 Run 1 Run 2 Run 3 Run 4
Recovery = Recovery = Recovery = Recovery =
70 percent 90 percent 50 percent 30 percent
• Samples collected from the permeate, the concentrate, and the feed will be
analyzed for the required parameters for each of the two membranes using
ICR-approved analytical methods. The laboratory will perform the analyses
listed below:
Analysis Feed Concen- Permeate Total/ Total/
trate quarter sample
Alkalinity 4 5 5 28 112
Bromide 4 5 5 28 112
Ca 4 5 5 28 112
Hardness
Total 4 5 5 28 112
Hardness
Turbidity 4 5 5 28 112
TDS 4 5 5 28 112
TOC 4 5 5 28 112
UV254 4 5 5 28 112
October 7, 1997 AMEND-3
Analysis Feed Concen- Permeate Total/ Total/
trate quarter sample
pH 3 5 5 26 104
Temp, 3 5 5 26 104
SDS-CI 3 5 16 64
SDS-TOX 4 5 18 72
SDS-THM 4 5 18 72
SDS-HAA 4 5 18 72
Total 346 1384
Task 7 - Reports
The following reports will be developed as follows:
Subtask 1 - Quarterly Reports
A quarterly report will be submitted to the City of Beaumont after all analyses for
each RBSMT session is completed.
Subtask 2 - Final Report
A final report will be submitted to the City of Beaumont summarizing the results
of all studies performed.
Subtask 3 - EPA Data Collection Software Report
The report will fulfill the specific EPA reporting requirements."
2. In Attachment B, Compensation, add $120,000 to the original sum of $151,170 for
a total lump sum of $271,170.
October 7, 1997 AMEND-4
IN WITNESS WHEREOF, the City of Beaumont has lawfully caused these presents to
be executed by the hand of the City Manager of said City, and the corporate seal of
said City to be hereunto affixed and this instrument to be attested by the City Clerk,
and the said Engineer, acting through an officer duly authorized, does now sign,
execute and deliver this document.
Done at Beaumont, Texas on this day of 1997.
Attest: By:
Official Title
Attest: City of Beaumont
By:
Ray A. Riley, City Manager
October 7, 1997 AMEND-5