HomeMy WebLinkAboutRES 97-137 RESOLUTION NO. q17 / ,7
WHEREAS, final inspection of water, sanitary sewer, storm sewer and street
improvements constructed in Pine Glen Subdivision, Third Addition, Phase One was made
by the Engineering Division and the Water Utilities Department as follows:
Street and Storm Sewer Improvements:
• Emily Lane from existing Toliver Road approximately 1,078 feet south to and
including the cul-de-sac.
• Sheila Lane from the proposed cul-de-sac at the proposed Emily Lane
approximately 184 feet west to 3 OM-4P end of roadway markers.
Water and Sanitary Sewer Improvements:
• Lots 1 - 22, Block 1
• Lots 1 - 17, Block 2
WHEREAS, the developers of said addition desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of Public Works recommends that said improvements meet
city standards and qualify for acceptance for permanent maintenance, and the City Council
is of the opinion that said improvements should be accepted and maintained by the City
of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the water, sanitary sewer, storm sewer and street improvements in Pine Glen
Subdivision, Third Addition, Phase One, with the exception of streetlights, are hereby
accepted by the City of Beaumont and shall be continuously maintained by the City
contingent upon filing of the final plat, complete with filings of dedication of all rights-of-
way and easements required on the preliminary and final plats.
PASSED BY THE CITY COUNCIL of the City of Beaumont on this the //.z/c-
day of f �� — , 1997.
1
- Mayor -