Loading...
HomeMy WebLinkAboutRES 03-277 RESOLUTION NO. 03-277 WHEREAS, construction of the street, storm sewer, water and sanitary sewer improvements constructed in the Pine Glen Fourth Addition Phase Two Subdivision have been completed as follows: Street and Storm Sewer Improvements • Kathy Lane from Tolivar Road approximately 1032 linear feet to Sheila Lane. • Sheila Lane from the existing Sheila Lane dead end approximately 297 linear feet west to the 3-OM-4P end of roadway markers. Water and Sanitary Sewer Improvements • Lots 1-17, Block 2 • Lots 1-17, Block 3 • Lots 8-12, Block 4 WHEREAS, the developers of said addition desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works and Engineering Department recommends that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT street, storm sewer,water and sanitary sewer improvements in the Pine Glen Fourth Addition Phase Two Subdivision, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 22nd day of December, 2003. - Mayor Evelyn M. Lord -