Loading...
HomeMy WebLinkAboutRES 98-142 RESOLUTION NO. 91-1 WHEREAS, on December 16, 1997, the City Council of the City of Beaumont, Texas, awarded a contract to Layne Texas, Inc., in the amount of $33,022.00 for the rehabilitation of Loeb Water Well Number Two, located off Highway 69, 287 in Hardin County; and WHEREAS, Change Order No. 1 In the amount of $8,140.00 as shown on attached Exhibit "A" is necessary to adjust the contract amount for "extra work" to replace parts for Well Number Two that have exceeded the expected design life. This change order increases the contract amount to $41,162.00; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby authorized, to execute Change Order No. 1 in the amount of $8,140.00. The project, as stated above, be and the same is herein accepted and the City Manager be and he is hereby authorized to make final payment in the amount of $41,162.00 be paid to Layne Texas, Inc. PASSED BY THE CITY COUNCIL of the City of Beaumont on this the 9 day of _, 1998. i W, OAz_ ._ - Mayor - APPROVAL OF CONTRACT CHANGE Change Order No. 1 &Final Date: May 26, 1998 Project: City of Beaumont Rehabilitation of Loeb Well Number Two Owner: City of Beaumont P.O. Box 3827 Beaumont,Texas 77704 Contractor: Layne Texas, Inc. 5931 Brittmoore Road Houston,Texas 77041 To The Owner: Approval of the following contract change is requested. Reason For Change: To increase the contract amount for"extra work" performed by the Contractor to replace parts of Loeb Well Number Two that exceeded the expected design life. ORIGINAL CONTRACT AMOUNT $33,022.00 THIS CHANGE ORDER $ 8,140.00 Description Increase of the contract amount for"extra work" to replace parts of Loeb Well Number Two that have exceeded the expected design life. 1 Each 12" x 19'9-5/8"Top Column Pipe Standard Wall $788.00 1 Each 2--7/16" x 20' TBE Lineshaft Carbon Steel 382.00 1 Each 3--1/2" x 77-1/6"Top Special Tubing 160.00 1 LS 10 - 3-1/2" x 6'8" Oil Tubing 1,059.00 1 LS 7 - 2-7/16" x 20' Lineshaft Carbon Steel 3,150.00 1 I-S 17 -2-7/16" Steel Shaft Coupling 2,601.00 Total Additional Amount $8,140.00 ADDITIONAL AMOUNT: + $ 8,140.00 TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER NO. 1 & FINAL $41,162.00 CONDITION OF CHANGE: "Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated in this Change Order represents full compensation for all increases and decreases in the cost of, and the time required to perform the entire work under Contract arising directly or indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and Contractor that the Change Order represents an all inclusive, mutually agreed upon adjustment to the Contract, and that Contractor will waive all rights to file a claim on this Change Order after it is properly executed." Submitted by: / Approved by: Approved by: S.A. Webb yne Texas, Inc. City of Beaumont EXHIBIT "A"