HomeMy WebLinkAboutRES 98-112 RESOLUTION NO. WHEREAS, on October 14, 1997, the City Council of the City of Beaumont, Texas, awarded a contract to Salenga Construction, Inc., in the amount of $203,737.56 for the 1997 Miscellaneous Paving Projects; and WHEREAS, during the course of the project, Change Order No. 1 was approved by Council on November 18, 1997 for $17,692.00; and WHEREAS, Change Order No. 2 is requested in the amount of $2,019.48 to adjust the estimated quantities to reflect final quantities actually used during the performance of the the contract thus increasing the final contract amount to $223,449.04 as described in Exhibit "A" attached hereto; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby authorized, to execute Change Order No. 2 in the amount of $2,019.48. The project, as stated above, be and the same is herein accepted and the City Manager be and he is hereby authorized to make final payment in the amount of$12,977.45 to be paid to Salenga Construction., Inc. PASSED BY THE CITY COUNCIL of the City of Beaumont on this the day of 1 l y� - Mayor - 4 CITY OF BEAUMONT DATE: May 6, 1998 PROJECT: Miscellaneous Paving Projects OWNER: CITY OF BEAUMONT CONTRACTOR: Salenga Construction, Inc. CHANGE ORDER NO.2 THE FOLLOWING CHANGES IN THE PLANS A.ND/OR SPECIFICATIONS ARE HEREBY MADE 1. Adjust the following quantities to reflect actual over/under runs as follows: 104-001 Remove Old Concrete(Pav) 650.1 SY 162.001 Sodding For Erosion Control 700 SY 276-001 PC Treated Base(6") 489.6 SY 360-001 8"Concrete Pavement 858 SY 529.001 Concrete Curb 505 L 531.001 Concrete Sidewalk 1041.7 SY 536-001 Concrete Medians 2350.9 SY 104n-001 Remove Concrete 286.6 SY 11OA-001 Roadway Excavation 120.3 SY 164A4)01 Seeding 0 Las 166A-001 Fertilizer 0 LBS 276A-001 PC Treated Base(9 1/2") 467.3 SY 340A-001 HMAC 104.8 TNS 350A-001 Fabric Under Seal 636 SY 36OA-001 8" Concrete Pavement 151.6 SY 400A-001 CSS(BKFL) 155.4CY 46OA-001 18"CMP 561 LF 53OA-001 6"Concrete Driveway 181.9 SY 2. Modify contract time to 140 calendar days to reflect time to complete additional work. ORIGINAL CONTRACT AMOUNT: $ $203,737.56 NET FROM PREVIOUS CHANGE ORDERS: $ $221,429.56 TOTAL AMOUNT OF THIS CHANGE ORDER: $ $2,019.48 PERCENT OF THIS CHANGE ORDER: 0.99% TOTAL PERCENT CHANGE TO DATE: 9.67% NEW CONTRACT AMOUNT: $ $223,449.04 TOTAL CONTRACT TIME IS AFFECTED BY THIS 012DER ACCEPTED BY: CONTRACTOR APPROVED BY: JAMES C.CLINE,JR,TRAFFIC ENGINEER TOM WARNER,DIRECTOR OF PUBLIC WORKS RAY RILEY,CITY MANAGER ATTESTED BY: PATRICE FOGARTY,CITY CLERK EXHIBIT "A'y