HomeMy WebLinkAboutRES 03-089 RESOLUTION NO. 03-089 WHEREAS, construction of the street, storm sewer, water and sanitary sewer improvements constructed in the Deerfield Phase One Subdivision have been completed as follows: Street and Storm Sewer Improvements ► Deerfield Drive from the existing Hwy.105 approximately 470 feet north to proposed Carrie Lane. ► Carrie Lane from the centerline of proposed Deerfield Drive approximately 432 feet west to the 3-OM-4P end of roadway markers, and from the centerline of Deerfield Drive approximately 355 feet east to Bonner Drive including the cul-de-sac. ► Bonner Drive from proposed Carrie Lane approximately 457 feet north to the 3-OM-4P end of roadway markers. ► Glen Rose Circle from proposed Bonner Drive approximately 491 feet west to and including the cul-de-sac. Water and Sanitary Sewer Improvements ► Lots 1-10, Block 1; ► Lots 1-4, Block 2; ► Lots 1-7, Block 3; and, ► Lots 1-14, Block 4; and, WHEREAS, the developers of said addition desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works and Engineering Department recommends that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT street, storm sewer,water and sanitary sewer improvements in the Deerfield Phase One Subdivision, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 6th day of May, 2003. 1 , - May Evelyn M. Lord -