Loading...
HomeMy WebLinkAboutRES 03-088 RESOLUTION NO. 03-088 WHEREAS, construction of the street, storm sewer, water and sanitary sewer improvements constructed in the West Chase Village, Section Two Subdivision have been completed as follows: Street and Storm Sewer Improvements ► Sunflower Lane from existing dead end approximately 839 linear feet north to the 3-OM-4P end of roadway markers. ► Windchase Drive from the existing Sunflower Lane approximately 586 linear feet east to the 3-OM-4P end of roadway markers. ► Village Drive from the existing Major Drive (FM 364) approximately 894 linear feet east to the 3-OM-4P end of roadway markers. Water and Sanitary Sewer Improvements ► Lots 9-21, Block 1; ► Lots 13-18, Block 3; ► Lots 1-7, Block 4 ► Lots 1-7, Block 5; and, ► Lots 1-3, Block 6 WHEREAS, the developers of said addition desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works and Engineering Department recommends that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT street, storm sewer, water and sanitary sewer improvements in the West Chase Village, Section Two Subdivision, with the exception of streetlights, are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of- way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 6th day of May, 2003. M or velyn M. Lord -