HomeMy WebLinkAboutRES 03-030 RESOLUTION NO. 03-030 WHEREAS, on June 19, 2001, the City Council of the City of Beaumont, Texas, passed Resolution No. 01-152 awarding a contract to Brystar Contracting, Inc. in the amount of $1,638, 724 for the Sanitary Sewer Rehabilitation of Small Diameter Mains Contract-III; and, WHEREAS, Change Order No. 1 is required increasing the contract amount by $242,673.61 and, WHEREAS, Change Order No. 1 in the amount of$242,673.61 is required for"extra work " to rehabilitate 3,917 linear feet of 8-inch sanitary sewer lines, 121 short side services, 14 long side services, replace 4 manholes, remove 15 manholes, install 260 linear feet of 8-inch laterals by open cut, and install 5 -8-inch main line cleanouts on Sue Street, Mazzu Street, and Hazel Street; and to install 220 linear feet of 8-inch sewer line by open cut on Manor Street, replace 1670 linear feet of 10-inch sanitary sewer lines, install 19 4-inch service line connections, remove and replace 4 manholes, and install one (1) new manhole on Kenneth Street, and correct the grade on a section on 8th Street, increasing the contract amount to $1,881,397.61; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be, and he is hereby authorized, to execute Change Order No. 1 in the amount of$242,673.61 for"extra work"as described above increasing the contract amount to $1,881,397.61. PASSED BY THE CITY COUNCIL of the City of Beaumont this the 28th day of January, 2003. - May r Evelyn M. Lord -