HomeMy WebLinkAboutRES 02-153 RESOLUTION NO. 02-153
WHEREAS,final inspection of street,storm sewer,water and sanitary sewer
improvements constructed in Washington West,Section Two, Phase One, was made by the
Engineering Division and the Water Utilities Department as follows:
Street and Storm Sewer Improvements:
• New York Boulevard from existing New York Boulevard approximately
202 feet south to the centerline of Montana Avenue and continuing south
approximately 157 feet to 3-OM-4P end of roadway markers;
• Montana Avenue from proposed East Nevada Avenue approximately
454 feet west to proposed New York Boulevard and continuing west
approximately 146 feet to 3-OM-4P end of roadway markers; and
• East Nevada Avenue from existing East Nevada Avenue approximately
157 feet south to the centerline of Montana Avenue and continuing south
approximately 143 feet to 3-OM-4P end of roadway markers.
Water and Sanitary Sewer Improvements:
• Lots 12-15, Block 2;
• Lots 6-10, Block 4;
• Lots 12 and 13, Block 5;
• Lots 1 and 2, Block 6; and
• Lots 1-5, Block 7.
WHEREAS,the developers of said addition desire to have these improvements
accepted and maintained by the City; and,
WHEREAS,the directorof Public Works recommends that said improvements meet
city standards and qualify for acceptance for permanent maintenance,and the City Council
is of the opinion that said improvements should be accepted and maintained by the City of
Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the street,storm sewer,water and sanitary improvements in Washington West,Section
Two, Phase One, with the exception of streetlights, are hereby accepted by the City of
Beaumont and shall be continuously maintained by the City contingent upon filing of the final
plat, complete with filings of dedication of all rights-of-way and easements required on the
preliminary and final plats.
PASSED BY THE CITY COUNCIL of the City of Beaumont on this the 9 h day
of July, 2002.
- Mayor Evelyn M. Lord -