Loading...
HomeMy WebLinkAboutRES 01-263 RESOLUTION NO. 01-263 WHEREAS, construction of the street, storm sewer, water and sanitary sewer improvements constructed in Pine Glen Fourth Addition, Phase One have been completed as follows: Street and Storm Sewer Improvements • Lori Lane from existing Tolivar Road approximately 990 feet south to proposed Sheila Lane • Sheila Lane from existing Sheila Lane approximately 305 feet west to three OM-4P end of roadway markers Water and Sanitary Sewer Improvements • Lots 1 - 34 • Lots 1 - 5 • Approximately 1,170 feet of 6"water line extending west along Tolivar Road and approximately 464 feet of an 8"sanitary sewer line extending west along Tolivar Road to the proposed lift station WHEREAS, the developers of said addition desire to have these improvements accepted and maintained by the City; and, WHEREAS, the director of the Public Works and Engineering Department recommends that said improvements meet city standards and qualify for acceptance for permanent maintenance, and the City Council is of the opinion that said improvements should be accepted and maintained by the City of Beaumont; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT street, storm sewer, water and sanitary sewer improvements constructed in Pine Glen Fourth Addition, Phase One are hereby accepted by the City of Beaumont and shall be continuously maintained by the City contingent upon filing of the final plat, complete with filings of dedication of all rights-of-way and easements required on the preliminary and final plats and installation of the streetlights. PASSED BY THE CITY COUNCIL of the City of Beaumont on this the 6th day of November, 2001. `VV - Mayor -