HomeMy WebLinkAboutRES 99-028 RESOLUTION NO. 99-a l
WHEREAS, final inspection of water, sanitary sewer, storm sewer and street
improvements constructed in Pine Glen Subdivision, Third Addition, Phase Two, was made
by the Engineering Division and the Water Utilities Department as follows:
Street and Storm Sewer Improvements:
• Jackie Lane from existing Tolivar Road approximately 1,078 feet south to
3 OM-4P end of roadway markers.
• Sheila Lane from existing Sheila Lane approximately 295 feet west to 3 OM-
4P end of roadway markers.
Water and Sanitary Sewer Improvements:
Lots 23 & 24, Block 1
Lots 18- 34, Block 2
Lots 1 - 17, Block 3
Lots 1 & 2, Block 4
WHEREAS, the developers of said addition desire to have these improvements
accepted and maintained by the City; and,
WHEREAS, the director of Public Works recommends that said improvements
meet city standards and qualify for acceptance for permanent maintenance, and the City
Council is of the opinion that said improvements should be accepted and maintained by
the City of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the water, sanitary sewer, storm sewer and street improvements in Pine Glen
Subdivision, Third Addition, Phase Two, with the exception of streetlights, are hereby
accepted by the City of Beaumont and shall be continuously maintained by the City
contingent upon filing of the final plat, complete with filings of dedication of all rights-of-
way and easements required on the preliminary and final plats.
PASSED BY THE CITY COUNCIL of the City of Beaumont on this the
day of , 1999.
06
- Mayor -