HomeMy WebLinkAboutRES 01-015 RESOLUTION NO.
WHEREAS, final inspection of the street, storm sewer, water and sanitary sewer
improvements constructed in Ashton Phase 2, Block 3 have been completed as follows:
Street and Storm Sewer Improvements:
• Savannah Trace from existing Savannah Trace approximately 422 feet north to
a proposed bridge crossing an existing concrete lined drainage ditch
• Natchez Trace from proposed Savannah Trace approximately 373 feet east to
and including the cul-de-sac
Water and Sanitary Sewer Improvements:
• Lots 1-9, Block 3
WHEREAS, the developers of said addition desire to have these improvements
accepted and maintained by the City; and,
WHEREAS,the director of Public Works recommends that said improvements meet
city standards and qualify for acceptance for permanent maintenance, and the City Council
is of the opinion that said improvements should be accepted and maintained by the City
of Beaumont;
NOW, THEREFORE, BE IT RESOLVED BY THE
CITY COUNCIL OF THE CITY OF BEAUMONT:
THAT the street, storm sewer, water and sanitary sewer improvements constructed in
Ashton Phase 2, Block 3, with the exception of streetlights, are hereby accepted by the
City of Beaumont and shall be continuously maintained by the City contingent upon filing
GAMRESOLUMMPROVE.RES
of the final plat, complete with filings of dedication of all rights-of-way and easements
required on the preliminary and final plats and installation of the streetlights.
PASSED BY THE CITY COUNCIL of the City of Beaumont on this the
r
day of c=�< , 2001.
- Mayor-
Pro TM
GACGRESOLUMMPROVE.RES