HomeMy WebLinkAboutRES 16-106RESOLUTION NO. 16-106 WHEREAS, on March 25, 2014, the City Council of the City of Beaumont, Texas, passed Resolution No. 14-067 awarding a contract in the amount of $16,478,838.95 to Brystar Contracting, Inc., of Beaumont, Texas, for the Washington Boulevard Pavement and Drainage Improvement Project — Phase I (Amarillo to Martin Luther King Parkway); and, WHEREAS, on March 17, 2015, the City Council of the City of Beaumont, Texas, passed Resolution No. 15-051 authorizing Change Order No. 1, in the amount of ($99,838.41), for minor design changes to better accommodate field conditions, thereby decreasing the contract amount to $16,379,000.54; and, WHEREAS, on November 17, 2015, the City Council of the City of Beaumont, Texas, passed Resolution No. 15-255 authorizing Change Order No. 2, in the amount of $85,093.00, to replace the existing piping system and fittings that connect the elevated water storage tank on Harriot Street to the City water distribution system, thereby increasing the total contract amount to $16,464,093.54; and, WHEREAS, on January 11, 2016, the City Manager executed Change Order No. 3 in the amount of ($8,634.64) for replacement of the roadway pavement markings that were not required with pavement markings that are required for installation to meet current State and Highway Standard Pavement Markings, thereby decreasing the total contract amount to $16,455,458.90; and, WHEREAS, Change Order No. 4, in the amount of $14,622.00, is necessary for additional changes to construct a concrete structure to retain and preserve the existing ay landscape improvements and adjust existing sanitary sewer manhole tops to match the proposed road pavement grade, thereby increasing the contract amount to $16,470,080.90; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the statements and findings set out in the preamble to this resolution are hereby, in all things, approved and adopted; and, THAT the City Manager be and he is hereby authorized to execute Change Order No. 4 for additional work described above, thereby increasing the contract amount by $14,622.00 for a total contract amount of $16,470,080.90 for the Washington Boulevard Pavement and Drainage Improvement Project — Phase I (Amarillo to Martin Luther King Parkway). PASSED BY THE CITY COUNCIL of the City of Beaumont this the 14th day of June, 2016.