Loading...
HomeMy WebLinkAboutRES 08-308 RESOLUTION NO. 08-308 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF BEAUMONT: THAT the City Manager be and he is hereby authorized to execute a Three Party Agreement with the Port of Beaumont and Burlington Northern Santa Fe Railway (BNSF) to allow construction work associated with the Calder Avenue Drainage Project to proceed under the railroad tracks. The agreement is substantially in the form attached hereto as Exhibit "A" and made a part hereof for all purposes. PASSED by the City Council of the City of Beaumont this the 18`h day November, 2008. c � - Mayor Becky Ames - nu �[ il1Nn r THREE PARTY AGREEMENT PROJECT: Calder Avenue Project THE STATE OF TEXAS X COUNTY OF JEFFERSON X THIS AGREEMENT, by and between the CITY OF BEAUMONT, TEXAS, the PORT OF BEAUMONT NAVIGATION DISTRICT OF JEFFERSON COUNTY,TEXAS,and the BURLINGTON NORTHERN SANTA FE RAILWAY, acting by and through its duly authorized Agent. W I T N E S S E T H THAT WHEREAS, the CITY OF BEAUMONT, PORT OF BEAUMONT and BNSF RAILWAY have reached an agreement wherein the CITY OF BEAUMONT is to install a storm drainage system within the drainage easement conveyed to the CITY OF BEAUMONT by the PORT OF BEAUMONT, and under the BNSF RAILROAD TRACK located within the street R.O.W. of Elizabeth Street and Cypress Street. WHEREAS, It is further agreed that upon execution of the agreement the CITY OF BEAUMONT will be granted a sixty one (61) hour construction schedule to complete the crossing. The sixty one (61) hours shall run continuous and provides forty eight(48) hours of continuous time for the City's Contractor to perform work under the railroad tracks and includes thirteen (13) hours for the Port's Contractor to remove and then to replace two sections of track. The City shall reimburse the Port the sum of$16,098.00 to complete this work. Thirty (30) days prior to this work beginning, the City will be granted a "Clear Zone" of ninety (90) days to complete the work East of the tracks. During this ninety (90) days, the PORT and BNSF agree to keep the drainage easement clear of any and all parked railcars. All work under the railroad tracks will meet construction methods as required by BNSF RAILWAY. The start date and time will be determined and agreed upon by all parties; NOW, THEREFORE, IT IS AGREED that the PORT OF BEAUMONT and BNSF hereby grants to the CITY the right and privilege to perform this work as shown on the attached plan sheet, and which is made a part hereof. THIS AGREEMENT IS SUBJECT, HOWEVER, TO THE APPROVAL OF THE BEAUMONT CITY COUNCIL. ALL TERMS AND CONDITIONS OF AGREEMENT ARE FULLY STATED HEREIN AND NO VERBAL AGREEMENTS ARE AUTHORIZED. EXECUTED this day of , 2008. CITY OF BEAUMONT PORT OF BEAUMONT By: By: Name: Name: (Printed) (Printed) Title: Title: BNSF RAILWAY By: Name: (Printed) Title: THREEPARTYAGREEN ENr.wpd EXHIBIT `A' K a I (R.O.W.) 1� %, x CYPRESS ST. OPE E-80 LOADING BOXES O f7AlOYO r110C101 041lii at Lem mo Cr r" oam 14'x10' BOXES Coca ZVOILmo S" 1aPauII7 siff.c (TYP.) - ALL cowk-I m w"A " I IAIZABET E z• _ rl - F a+ Z 0 Z , n I ,-p r(nP.1 Z W F 113.9 WI I rnn� O V F 3'-f•unf ar PAUMf roe TOOT MAwfa ' Z Z M �`I�r \♦ // RAILROAD CROSSING #1, STA. 276+51.34 TQ STA. 277+5.34 a f1' L3s1 (COOPER E-80 LOADING BOXES) G- Ix S y F 13 r \ SCALE: NTS O p Is e I sip x 3 %J € 0 ^ z /R TFACK ELEVATIONS 16 LIFT R. .W. PR FILE 6 0 O 13.95 - U 1 .13 13.53 4 \ a E-8C LOADING BOXES t 3. 2 STA. 276+5 .34 7 STA. 277 .34 12 um 10 I-1111; Sol AN 7 0 - p 1 11113 RAILROAD CROSSING i1 Top:�-414- - 4 ` O TOP C CON C. BO E . 10.5.' 6 k d A r AA Z 6 JIM a ® n - PLAN&PROFILE ® TACO CALDER AVE., 2 2 ® A PHASE e• E RacK T F F STA.276+51.34 TO STA.277+5.34 0 0 rur SHEET 2 OF 2 bA fY:xf cxfr:zr Aarar: nATe r�TMM 2 6+00 2 6+ 2 7 '1 2 7+80 278L+00 2 6+20 2 6+40 2 8+60 L..0 + o-/annn t :WnxrlNarolAOybAldrVtR